Free cookie consent management tool by TermsFeed Cookies
Video

How to Install Wall Mount Shower System?

256 Published by Kobia 9月 13,2021

 

 

Step1:Install the hot and cold water pipes according to the corresponding signs

Step2:The lowest cutting line of the embedded box (Tile paving completed drawing) 50-60mm Minimum embedded depth

Step3:Increase or decrease the thickness of the rough ground according to the size drawing

Step4:Punch four holes , Install expansion screws , Unscrew the nut,Reinforce the nut with a wrench

Step5: Insert the embedded box according to the hot and cold water mark

Technical Support: Magic Lamp